With the gradual development of electronic products towards short, small, light and thin, the advantages of FPC soft board are becoming more and more obvious, and the market demand is also increasing. However, the delivery time has become a concern of many buyers. So what is the production cycle of soft board? Let's talk about it in detail.
The production of FPC soft board is a complex process. From the initial engineering data processing to the final packaging and warehousing and shipment, each process requires relevant staff to carry out production processing, which takes a long time.
Generally, the delivery period of single-panel and double-panel proofing is 4-5 days, and it can be completed within 48 hours if it is urgent; In case of batch production, because it is necessary to outsource professional mold production companies to manufacture molds, this process takes 3 days, and the quantity is relatively large. Generally, the delivery period of small batch production is 6-7 days, and that of large batch production is 8-10 days.
If it is a multilayer board or a combination of soft and hard boards, it is more difficult than single-sided and double-sided boards
Online
Service
ConsultationTime:9:00-18:00
Hot
Line
0755-27847787
7*24H Service
Follow
Us